Quality Engineer Resume: Sample and Free Template [2020]

Use these Quality Engineer Resume Sample Bullets to create your Resume and land your dream job. All of these can be accessed for free in our in-product Quality Engineer resume templates. Explore them below.

Search Quality Engineer Resume Bullets for your Resume:

  • Managed a $2M project to improve the process of a new, high speed data center
  • Managed all phases of the design and development process for a new product
  • Managed multiple project projects from inception to closeout, ensuring all deadlines and timelines are met
  • Managed project to improve the accuracy of data and to reduce the number of errors
  • Managed engineering and manufacturing teams for the design of a high-speed fiber optic network
  • Managed projects from initiation through delivery, ensuring that the quality of work is maintained and meets the requirements of regulatory bodies
  • Managed risk and identified opportunities to improve process performance and quality
  • Managed, monitored and evaluated the quality of all work
  • Managed an engineering change control process for a new system
  • Managed over 100 projects and achieved a 95 percent on-time delivery
  • Managed the implementation of a $2M project to upgrade the existing network infrastructure
  • Managed a $10MM annual project to improve the reliability of a large-format printer
  • Managed all phases of project from initial concept development, design and implementation to final production
  • Managed over 100+ workflows and projects for the project
  • Managed development of a quality system for the entire product portfolio
  • Managed a team of 6 to 8 people in the development of a new software package for the company
  • Managed all aspects of the production process from initial concept through completion of the final assembly
  • Managed multiple projects and provided leadership to a staff of 15 engineers and technicians
  • Managed daily operations of a multi-site manufacturing environment
  • Managed an engineering group of 5 engineers and 3 supervisors
  • Managed engineering change requests and provided technical guidance to the Engineering Department on all project changes
  • Managed team of 5 employees and oversaw the day -to-. Responsive to customer service, problem- solving and quality control
  • Managed an engineering group of 5 engineers and 3 support personnel in the development of a new process for the manufacture of a high speed laser
  • Performed analysis of the data and developed a report to be used by the management
  • Performed quantitative and graphical analysis of the statistical process and data
  • Performed in depth analyses of the manufacturing processes and developed a comprehensive report to support the manufacturing process
  • Performed data analysis and developed a comprehensive plan to implement the project in a
  • Performed analysis of the performance and quality assurance data to identify areas of improvement and recommended corrective action
  • Maintained and updated the PPAPS (Quality Management Process).
  • Maintained a clean and safe working enviorement for the entire plant and its personnel
  • Maintained the highest standards of customer satisfaction and service in a fast paced, high-volume environment
  • Maintained all aspects of the company, from scheduling to production
  • Maintained an inventory of all equipment and parts for the company
  • Maintained production schedules and quality standards, monitored product performance
  • Maintained all data for the department and maintained a high standard of quality and accuracy
  • Maintained records of work performed and the progress made to ensure that corrective action is taken
  • Maintained daily production schedule, and monitored quality of finished product
  • Maintained an inventory of all equipment and parts for the department
  • Maintained project schedules and budgets, managed projects through the project lifecycle
  • Maintained daily production and test logs
  • Maintained and updated the quality management database for all of the company's quality programs
  • Maintained a high quality of product and customer relations by maintaining a high standard of quality
  • Maintained a database of the number and types used in statistical analysis
  • Maintained accurate and timely production of the following equipment
  • Maintained high level of accuracy and quality
  • Maintained accurate and timely data for the development of a project management tool to track the progress of projects
  • Maintained an accurate, up keep of the plant
  • Maintained daily production and inspection reports, performed weekly quality checks and maintained all production logs
  • Maintained detailed project records and performed quality assurance testing of various products
  • Maintained a high degree of quality assurance and reliability for the entire manufacturing process
  • Maintained monthly and yearly production schedules for the plant and its employees
  • Maintained and repaired various electrical equipment
  • Maintained the PPAPS and PAP for all projects
  • Maintained all aspects of the project including, design review and approval of all work, scheduling for the construction of all projects
  • Maintained an inventory of raw material, parts and finished goods for the manufacturing of a wide range products
  • Maintained daily production schedule and quality control for the company
  • Maintained records of work completed and submitted to the project manager for review
  • Maintained high standards of cleanness and safety in work areas, equipment storage methods and pallets
  • Maintained 100% compliance with ISO 9000 and Quality Assessment Manual (SAMS).
  • Maintained, repaired and tested various types of electrical components
  • Maintained project schedule and ensured that all required tasks, including the development of project scope, milestones and schedules
  • Maintained project schedule and ensured all required materials are ordered and received in a time sensitive manner
  • Maintained daily production and material control records, ensuring compliance with all safety and health standards
  • Maintained detailed project schedules for multiple projects, coordinated with project management to ensure deadlines are met
  • Maintained production schedule and ensured all equipment is in proper working condition for production
  • Assisted in the design and implementation of a prototype for the new product line
  • Assisted with the design and implementation of a CNC machining system for the company
  • Assisted the project team in identifying and implementing new process improvement initiatives
  • Assisted customers with technical issues and resolved them in a professional manner
  • Assisted engineers in the development of a process to improve the quality of a product
  • Assisted engineering in the design and implementation of a variety test equipment
  • Assisted Engineers in the design and implementation of a variety engineering projects
  • Assisted engineers in the design and implementation of a novel, high-throughput process for the manufacture of a new, low cost product
  • Assisted Project Managment with the development of a project management system for the development of a project manager for the implementation of a project manager for the development of a project manager
  • Assisted Engineers in the development of new products and procedures for the manufacturing of new product lines
  • Assisted clients in the development of a comprehensive plan to address their business and financial challenges
  • Assisted project managers in the design and implementation of a variety engineering projects for the Department of Energy
  • Assisted clients with the development of a comprehensive, cost effective and efficient process for the development of a comprehensive, and efficient
  • Assisted clients with the development of a comprehensive plan for the implementation of a new system for the FFE
  • Assisted in the creation of a product line for the first time in company history
  • Assisted the project managers in identifying and implementing process changes to improve the project management system
  • Assisted customers with purchasing and maintaining a clean, organized work environment
  • Assisted engineers in the preparation of corrective action documents for the following Corrected and maintained all documentation for the project
  • Assisted project manager with the implementation of a project to reduce the number of defects in a project
  • Assisted customers with technical support and product knowledge related to products
  • Assisted on the project to design and develop a data base for the development of a new product
  • Assisted on the production of a new process for the manufacture of a product
  • Assisted Engineers in the preparation of a variety engineering reports for the Department of Energy
  • Assisted Production Engineers in the planning and implementation of manufacturing procedures, processes
  • Assisted Engineering in the identification of a process and system problem
  • Assisted clients with all phases of the project lifeprogramming process from initial start-up to project closure
  • Assisted Engineers in the construction of a large industrial wastewater plant
  • Assisted customer with their purchase of a vehicle and assisted with the installation of new vehicle
  • Assisted with the design and implementation of a system to track the production of a variety products
  • Assisted the PM with all phases of PPAPS and PMO activities
  • Assisted engineers in the testing and troubleshoots of production machinery, including the testing and repair of production machines
  • Assisted customers with the installation of new and replacement parts
  • Assisted Project Manager in the design and implementation of a new process for the manufacturing of a novel polymer
  • Assisted on the design and implementation of a statistical software package for the Department of Energy's National Grid
  • Assisted and trained employees in the use of various types and methods to ensure the quality of products
  • Assisted project manager in the design and implementation of a new process for the manufacturing of a high-pressure, liquid oxygen fuel system
  • Assisted project manager with the design and development of a new system for the SPSS
  • Assisted and supported the FFEA in developing a new FFEB program
  • Assisted and supported the project manager in all phases of the design and construction process
  • Assisted clients in the identification of root causes and solutions to prevent, detect or resolve problems
  • Assisted a team of 5 Engineers in the design and development of a new process for the manufacturing of a novel product
  • Assisted clients with the selection of their home improvement projects
  • Assisted Engineering in the preparation of a report for an audit
  • Assisted management with the preparation of statistical data for presentation to the board of education
  • Perform calculations and reports for the analysis of statistical information and trends
  • Perform analytical and technical research to develop statistical methods and procedures for the purpose of analyzing and reporting on the performance of various programs and services
  • Perform on-going analysis of manufacturing process and product performance to determine root- cause of product failures
  • Provided technical guidance and support to the Engineering, Manufacturing & Quality departments on the development of new processes and procedures
  • Provided support to the Engineering and Manufacturing teams in developing new processes and systems for the manufacturing of high quality products
  • Provided support to the Quality Engineer in developing and maintaining the Quality Management system
  • Provided recommendations for improvement of the quality system and process improvement
  • Provided oversight for the development of a comprehensive, cost effective corrective action program for the company
  • Provided feedback to the Quality Control Department on corrective action procedures
  • Provided analysis and recommendations for product design
  • Provided design and development of a statistical model to evaluate the effectiveness of a new system for the department
  • Provided detailed reports to management and senior leadership on the progress of projects and activities
  • Provided input to the design and implementation of a system to track and monitor the quality of all product
  • Provided technical assistance to the Engineering department in developing and testing new equipment for the company
  • Provided support to the manufacturing and quality teams for all processes
  • Provided leadership and guidance to the team in developing and maintaining a quality control program for the company
  • Provided oversight for the implementation of a comprehensive, integrated process improvement plan for the company's manufacturing operations
  • Provided feedback to the team on corrective action andor improvement opportunities
  • Provided onsite engineering and project support for the design, development and delivery of a new product
  • Provided input to the design and implementation of a process for the production line
  • Provided detailed reports to the management and staff on all projects
  • Provided support to the project manager and engineering staff to ensure the completion of all project requirements
  • Provided reports to the Board of Directors and other management
  • Provided solutions to the engineering, manufacturing and customer support teams to ensure the successful delivery of quality products
  • Provided a variety of administrative and technical assistance to the Director of Operations and other senior management
  • Provided engineering support to the development of a comprehensive, risk-management program for the US Air Force
  • Developed and maintained a database of over 200 suppliers and vendors
  • Developed process improvement strategies to reduce the amount of waste and increase productivity by 30% in the manufacturing of high quality parts
  • Developed the design and implementation of a process to improve the quality of a product
  • Developed new process and procedures for the production of a variety products
  • Developed & executed a comprehensive process to identify and resolve issues with the product
  • Developed policies and processes to mitigate risks, identify opportunities and implement solutions to mitigate risk
  • Developed design and implementation of a process to improve the efficiency of a new product
  • Developed procedures for the development of a system to monitor the performance of a system
  • Developed procedures for the development of a process to improve the quality of a product
  • Developed standard procedures for the manufacturing of high quality parts and assemblies
  • Developed high performance manufacturing processes and systems for the production of high quality automotive parts
  • Developed a new product that is now used in the industry
  • Developed a new method to calculate the percentage of time that a given amount is processed by the company
  • Developed new process for the development of a high speed digital camera
  • Developed an APIQC system for the development of a new product for the production of a high speed liquid chromatographic analyzine
  • Developed & executed a process for the removal of all hazardous waste from the plant
  • Developed project plan for the implementation of a system to monitor the quality of all incoming and outgoing materials
  • Developed project schedules for the entire plant, coordinated with engineering and manufacturing to ensure the plant was in good condition
  • Developed and implemented a manufacturing system for the manufacture of industrial and consumer products
  • Developed a new system for the FFEB to track and monitor all aspects of the project
  • Developed, implemented and managed a statistical analysis of the data for a large, complex project
  • Developed the process for creating and maintaining a quality system for the manufacturing of a wide variety products
  • Developed process and procedures for the development of a high-performance manufacturing facility
  • Developed an audit program for the company to review and audit all the processes
  • Developed inspection procedures and test plans for the following inspection procedures
  • Developed & implemented a manufacturing and engineering program for the company's new product development
  • Developed analytical methods to measure the effectiveness of statistical analyses
  • Developed procedures for the identification and resolution of all quality issues, identified root- cause and implemented corrective action
  • Developed procedures and tools to support the development of process improvements and cost reduction
  • Supervised and performed the analysis of data for a large scale project
  • Supervised over 50 engineers and project management staff in the design, development and implementation of a new system for the company
  • Supervised daily activities of the engineering team, ensuring all projects were completed on time and within budget
  • Supervised the design of a computer-controlled instrument to evaluate the performance of a large-scale instrument
  • Supervised daily operations of the manufacturing process, which involved quality assurance and process design
  • Manage team of engineers and project management professionals to develop, implement and maintain the company's business process, procedures and policies
  • Coordinated and supervised the development of a risk assessment and mitigation plan for the company
  • Coordinated the development of a process for an electronic document control system
  • Coordinated all aspects of the corrective action plan for all assigned projects
  • Coordinated project activities with other engineering departments to meet deadlines and ensure quality of work
  • Coordinated project with other engineering teams to identify and correct any issues
  • Coordinated efforts with the Engineering, Manufacturing and Operations teams to ensure the successful completion of all projects
  • Coordinated product design and manufacturing processes to ensure product met or exceeded customer specifications
  • Coordinated the implementation of a corrective actions plan for the department
  • Coordinated project schedules with engineering staff, and ensured project deadlines were met, while adhering to all project policies and guidelines
  • Coordinated production activities with engineering to meet customer specifications, quality and schedule goals
  • Coordinated design and implementation of a statistical process for the purpose of analyzing and reporting on the effectiveness of a project
  • Coordinated multiple project schedules to maximize productivity and accuracy of the project
  • Coordinated with the Engineering team to ensure all requirements and specifications are being met
  • Coordinated the design and implementation of a quality control process for the production of a wide variety products
  • Coordinated project schedules and ensured that all required materials, tools and supplies were on-hand
  • Coordinated daily activities with the Quality Control Manager, and ensured all required documentation is in place
  • Coordinated projects with engineering teams and vendors to meet deadlines
  • Coordinated on-going process improvements and cost reductions for the company's manufacturing and engineering departments
  • Coordinated production schedules and quality assurance activities for a wide variety of projects
  • Maintain records of work performed and the results
  • Maintain the data base and prepare statistical analysis
  • Maintain accurate and timely documentation of the quality process and procedures
  • Maintain high level of accuracy and quality control in manufacturing
  • Maintain high level of accuracy and quality in a variety of projects
  • Maintain a high standard of product quality and production readiness
  • Maintain accurate and up todate records of the project
  • Provide analysis of the data and report to senior leadership on the progress of projects
  • Provide training and guidance to the engineering staff on all aspects of the project
  • Created and maintained a database of over 200 corrective action forms
  • Created the first ever Safety Risk Assessment for the entire plant
  • Created an Excel based tool to analyze the impact of a new product on the business
  • Created & implemented a new safety training manual for the entire plant
  • Created an ISO 9000 quality assurance process for the entire manufacturing facility
  • Created custom reports for the company to monitor and report on production
  • Created detailed work orders for production and engineering teams to complete
  • Created design and test documents for the development of a custom software application for the US Army
  • Created standard work orders and performed corrective action on work related issues
  • Created new processes and standards for the department to improve efficiency and effectiveness
  • Created the first and largest single-source inspection tool for the entire company
  • Created an automated system to manage the corrective action processes
  • Created custom reports for the department to improve productivity, efficiency and customer satisfaction
  • Assist the engineering department in developing and maintaining a comprehensive engineering program for the new and existing products
  • Assist customers with technical issues and troubleshoots their computer
  • Assist customers with product selection and installation, process quality checks
  • Assist engineering in the development of new products and process improvement
  • Assist customers in the selection of products andor equipment to meet their specific needs
  • Assist on the development of new products and process improvement initiatives
  • Assist team in the development of new procedures and policies, as well
  • Assist Production Engineers with the design and implementation of a custom software application for the company's
  • Assist with the implementation of a Lean manufacturing methodology to support the development of new processes and procedures
  • Assist the team in identifying and implementing new procedures, policies & processes for the process improvement
  • Assist engineering in the preparation of project proposals
  • Assist to the Quality Control department in developing and evaluating the Quality Control System
  • Assist Engineering in the preparation of project plans for new projects
  • Assist production with product testing
  • Assist lead engineers in the planning and execution of process changes
  • Assist Engineers in the identification and resolution of issues with the Risk Management system
  • Assist the Engineering team in developing and executing the engineering change management plan
  • Assist management in the design and implementation of a new Risk management program
  • Assist senior management in the design, implementation and testing of a comprehensive, integrated process improvement program
  • Assist project managers in the design, implementation and testing of new or modified equipment
  • Assist team in the planning and execution of Lean projects
  • Assist on the development of QMS for a large scale manufacturing plant
  • Assist engineering in the identification and mitigation of risk
  • Lead a group of engineers to design and develop a system for the detection of chemical and biological hazards in the oil field
  • Lead all aspects of corrective actions for the company
  • Lead multiple project activities for the design and implementation of a new product
  • Lead an effort to reduce the number of potential incidents and injuries by 30%.
  • Lead continuous improvement initiatives to ensure quality of product
  • Implemented an internal Quality Assessment System to track and monitor the Quality Assessments
  • Implemented an internal process to improve the accuracy of all work orders
  • Implemented, developed and implemented process improvement initiatives to reduce cost and improve product quality
  • Implemented multiple process improvement projects to reduce cost and increase efficiency
  • Implemented multiple processes to improve the efficiency of production and reduce waste
  • Implemented and managed the development of a quality system for the company
  • Implemented the use of a Statistical Process to create and validate the results of a project
  • Implemented multiple processes to streamlining the design of a prototype
  • Implemented standard operating practices for the manufacturing of high performance products
  • Implemented several process improvement techniques to improve product performance, reduce cost and increase productivity
  • Implemented standard processes for the production of materials and equipment
  • Monitored the performance of all engineering and quality processes to meet the customer requirements
  • Monitored, documented and reported on the progress of quality assurance activities
  • Monitored, tracked and reported on the risk of a project
  • Monitored, documented and reported on the status of all projects
  • Monitored, maintained and repaired HMI systems
  • Monitored production and finished goods processes to identify potential problems and opportunities
  • Monitored performance of the team to identify and correct any issues
  • Monitored daily operations of the facility to include, safety and quality assurance of all products, equipment and supplies
  • Monitored production, material and process quality to identify areas for improvement
  • Monitored performance of the quality assurance team to identify and correct deficiencies
  • Monitored daily operations of the Quality Assuring department to meet or exceed the company standards
  • Monitored product performance and quality control, developed process improvement strategies and implemented corrective actions
  • Monitored system and equipment performance to identify potential safety and operational issues
  • Monitored manufacturing process and equipment to identify root causes of production problems
  • Monitored and evaluated the effectiveness of existing product lines and provided recommendations for new products
  • Monitored the performance of all engineering and quality processes, including the development of new quality standards and the evaluation of current processes
  • Monitored all data collection, analyzed and summarized statistical information to ensure accuracy and completeness of reports
  • Monitored process and product development, including the testing of products and processes to ensure that they meet specifications
  • Monitored all production lines to make certain they met all safety and quality guidelines
  • Monitored performance of all mechanical and electronic systems in the production of industrial machinery
  • Monitored process and product parameters to determine the optimum process
  • Monitored process performance and provided statistical analysis of data for the purpose
  • Monitored daily operations to determine if the project is in line with company policies and objectives
  • Monitored equipment and systems for proper functioning, safety compliance
  • Monitored and evaluated the effectiveness of corrective action activities and provided feedback to the management
  • Monitored the progress of projects and provided status reports to senior leadership and project teams
  • Monitored all aspects of the manufacturing process to include quality control and safety
  • Monitored project progress and made necessary adjustments to ensure
  • Monitored process performance and provided recommendations for improvements to the manufacturing processes and procedures
  • Monitored work processes and ensured compliance with established standards, procedures and policies
  • Monitored progress of the FFEAs and ensured they were in line with the FMEAs
  • Monitored product performance and ensured that quality control measures met or surpassed production goals
  • Monitored daily production and maintenance schedules
  • Monitored progress and implemented changes to improve processes
  • Monitored compliance with quality control procedures, policies and government regulations; developed, monitored & evaluated quality control procedures, processes and controls
  • Monitored process performance and provided feedback to the team members
  • Monitored progress of the quality assurance process and made adjustments to ensure that quality control measures were being met
  • Monitored process and quality assurance of all product
  • Monitored system performance and quality of products, monitored production schedules and quality control procedures
  • Operated a variety of equipment to perform the duties and functions of a maintenance technician
  • Operated equipment to perform preventive and predictive
  • Operated an electronic test equipment to measure the quality of raw materials and final product
  • Operated equipment to produce a wide range of products for the oil and natural gas industries
  • Operated multiple machines to produce high-grade metal products for the automotive and aerospace industry
  • Operated with a focus on the development of new processes and procedures
  • Operated power tools and equipment to produce data for the analysis of production and quality
  • Operated a variety of automated and semi - manual equipment to perform statistical tests on various types of data
  • Operated multiple production machines to process product, maintain inventory and order supplies for production
  • Operated a computer system to enter, track and update data for the purpose of maintaining and improving quality
  • Operated as a team leader to develop and execute a comprehensive, high-performance project management plan
  • Operated various types of machinery and equipment to perform quality control on finished products
  • Operated heavy equipment to transport and deliver products
  • Operated data entry and maintained database
  • Led a group of engineers in the design and implementation of a new system for the production of a high-pressure liquid nitrogen tank
  • Led and directed the development of a comprehensive, cost effective corrective action program for the company
  • Led team of 10 engineers in the design and implementation of a new system for the company's largest client
  • Led teams of 5 to 20 people in the design and development of a new process for the manufacturing of a high speed liquid crystal product
  • Led continuous process improvements to meet the changing demands of business
  • Led teams of up to 10 people in the design and development of a new system for the production of a high quality, low-pressure water treatment system
  • Led implementation of a new system for the department to ensure that all corrective actions are completed in a safe and efficient mannor
  • Led numerous successful project teams to deliver a high quality, cost effective and reliable system for the entire organization
  • Led team of 6 to implement and maintain a high level of quality assurance
  • Led an analysis of the effectiveness and reliability for a major project
  • Led process improvements to increase efficency and efficiency in the production process, resulting from lean manufacturing
  • Led process improvements to meet business needs and reduce waste by 50%. Developed process improvements to improve the accuracy and quality of data
  • Led implementation of a $10 million project to reduce the number of incidents and improve safety
  • Led the development of a comprehensive corrective actions program for the entire organization
  • Led a team of 6 Engineers in the design & development of a new manufacturing facility
  • Led and managed the implementation of a process to streamline the processes and increase productivity
  • Led all aspects of the APQC project from concept to implementation
  • Led cross-deposition of manufacturing and quality control teams to achieve high levels of quality and productivity
  • Led cross-deposition of engineering and project managers to meet business needs
  • Led several projects to support the development of a multi-year project to replace the existing legacy system
  • Led development of a process to reduce the amount of time required to complete a process
  • Led efforts to design and develop a CNC machine shop for the manufacture of a new CNC mill
  • Led implementation of a comprehensive safety program for the plant
  • Conducted and maintained a variety of technical data collection and reporting activities
  • Conducted safety inspections and performed root- cause analyses of the plant
  • Conducted weekly meetings with the Engineering team to review and approve corrective actions for the entire project
  • Conducted analysis of the design and development process for a variety of industrial and commercial projects
  • Conducted data collection and analysis of the statistical process
  • Conducted weekly inspection of all work areas to insure compliance with all safety and quality requirements
  • Conducted analysis of the existing products and provided technical support to the development teams
  • Conducted project reviews and provided recommendations for improvements to the APQP system
  • Conducted extensive analysis of the current and proposed design for a new product
  • Conducted research and developed a project to improve the performance of a new software application
  • Conducted and presented research on the feasibility of developing a prototype
  • Conducted weekly, quarterly and monthly quality assurance inspections on a variety of manufacturing processes
  • Conducted weekly meetings with the engineering department to ensure quality of work
  • Conducted a wide array of research and analysis to determine the feasibility of new products and technologies
  • Conducted monthly and yearly audits of the quality process to assure compliance with company standards
  • Conducted audits of manufacturing facilities to identify and eliminate noncompliance issues
  • Conducted weekly meetings with the team to review and analyze project progress, identify areas of improvement and implement changes
  • Conducted daily, monthly & yearly quality inspections of the manufacturing processes and equipment
  • Conducted on-going reviews of all engineering and maintenance activities to identify areas of opportunity and develop actionable corrective plans
  • Conducted on-going root cause analysis of the product
  • Conducted weekly meetings with the engineering team to review and resolve issues with the product
  • Conducted the inspection of aircraft parts and components for the purpose of ensuring compliance with FAA and OSHA regulations
  • Conducted engineering and design studies to determine the most effective and efficient methods of producing the product
  • Conducted research and development of a new product for the purpose of developing a more effective and cost-efficient method of manufacturing
  • Conducted analysis of the design and development process to ensure that the project was in line with business requirements
  • Oversee design and implementation of the company wide Quality Assertive Maintenance Program
  • Oversee the development of a comprehensive corrective actions program for the entire plant
  • Oversee project management of the Quality Assessment and Control process for the company
  • Prepared reports for the Director of Operations and other departmental staff
  • Prepared engineering documents for the development of a prototype system for the purpose of testing and evaluation
  • Prepared technical documents for the project team and provided support to the project manager
  • Prepared detailed engineering drawings, performed quality assurance reviews and ensured compliance with quality standards
  • Prepared for and conducted corrective actions, reviewed work plans and provided recommendations for corrective action
  • Prepared technical drawings and specifications for the following projects
  • Prepared project reports and presentations for the departmental meetings, including project budget and cost analysis
  • Prepared and submitted proposals for product design
  • Prepared reports and recommendations for management
  • Prepared engineering documents for the project, and performed data collection
  • Prepared the annual financial statement for all of the business
  • Prepared all documents for the inspection of equipment
  • Prepared reports and analyses for the Engineering Change Board and other stakeholders
  • Prepared a detailed engineering plan for the development of a novel, high throughput liquid-liquid hybrid fuel injectable
  • Prepared all drawings for the construction of a large industrial wastewater treatment plant in the state of Texas
  • Prepared proposals for the design and development of a high pressure water treatment facility
  • Prepared a comprehensive project schedule for the installation of a high-speed Internet service
  • Prepared and submitted all necessary reports, documentation for compliance with the company's safety and environmental regulations
  • Prepared, maintained and updated all production records, schedules
  • Prepared, reviewed and analyzed reports for the purpose of identifying and correcting deficiencies
  • Prepared detailed engineering plans for the development of a high-pressure, low temperature water treatment system
  • Prepared the design and implementation of a process for the production line to reduce waste and improve the quality of product
  • Prepared daily reports for the department
  • Prepared design documents and reports for the development of an automated system for the purpose of identifying and resolving issues
  • Prepared analytical reports and analysis of data for the Department
  • Prepared financial reports for senior executives
  • Prepared various types of reports for the CPM, including monthly and quarterly financial reports
  • Prepared daily reports for the Quality Manager and Senior Engineer
  • Coordinate design and testing of new products
  • Coordinate efforts with engineering to develop and execute a comprehensive engineering change management program
  • Directed all engineering and quality control efforts for the manufacturing of a new high-pressure water treatment system
  • Directed manufacturing, engineering and production teams to achieve high-quality products and services
  • Directed and coordinated the analysis of data for a wide array projects
  • Directed a group of 20-30 engineers and analysts in the development of a comprehensive statistical analysis tool for the purpose of analyzing and summarization data
  • Directed corrective actions to resolve production problems and ensure timely delivery of quality services
  • Directed a team of 6 to develop and execute a new product development strategy for the company
  • Directed implementation of a process to reduce the amount of time required to complete a job
  • Directed multiple projects and oversaw the completion of over 1,500 work orders
  • Directed projects from concept to production
  • Helped develop and execute a comprehensive project management process for the development of a new business unit
  • Helped to design and implement a process improvement program for the company
  • Helped with the design and implementation of a system to manage the inventory of all parts and supplies
  • Helped design and manufacture a variety of equipment for the manufacturing and distribution of pharmaceutical products
  • Helped the team to improve their performance by developing a process to reduce the number of defects
  • Helped resolve customer complaints and issues, including billing disputes
  • Helped build a team of quality professionals to support the development of a quality management program
  • Helped manage the development of a project to improve the efficiency of a large-volume, high volume manufacturing facility
  • Helped reduce the amount of work performed by over 30%.
  • Helped manage the process of producing and testing a wide range of products for the manufacturing and distribution of medical devices
  • Helped improve the process of creating and implementing a more effective process for the company
  • Helped with the implementation of a process to stream-test the product and improve quality
  • Helped in the implementation of a process to ensure all the required documents and documentation was completed in a safe and effective mannor
  • Helped in the creation of a SOP for all the components of a new system
  • Helped create and maintain a quality engineering system for the production of industrial chemicals
  • Helped create and execute a comprehensive project management strategy for the company's first ever global project
  • Helped build a team of 6 people to create a product that was used in the automotive industry
  • Helped improve the efficiency of a team by creating and managing the project timeline, tracking progress and providing updates to the team
  • Helped reduce the time to process and maintain a clean, safe work place
  • Helped achieve the production of a $2M annual sales volume
  • Helped identify and solve the root causes of errors in statistical analysis
  • Helped achieve the best results in all phases of the audit process
  • Helped maintain and update the company website, created new and updated existing marketing materials for the company
  • Helped coordinate the development of a CPM system for the company's first CNC mill
  • Helped to develop and execute a new quality system for the manufacturing of a wide range products
  • Helped develop and execute a process improvement program for the company's new product development
  • Helped with the design and implementation of a P&ID for the new product
  • Helped in the design and implementation of a statistical model for the analysis of data
  • Helped implement a process to eliminate waste and increase production
  • Helped the company to meet and exceed all goals set by the customer
  • Helped create and maintain a quality control program for the company's product line
  • Helped build a prototype of the new FFEB system for a major manufacturer of industrial chemicals
  • Helped establish a manufacturing environment for the production of a wide range products
  • Helped manage the development of a new product for the company's largest customer
  • Helped set up and operate a production facility for the company's largest customer
  • Helped customers with questions and problems regarding the products they were looking for
  • Completed and maintained a variety of engineering drawings and technical documentation
  • Completed a comprehensive review of the quality system and implemented a new process to improve the quality of work
  • Completed multiple tasks in the development of a web- based application for the company
  • Completed over 200 studies on the impact of a chemical in water on the environment
  • Completed a project to create an electronic data system for the company's manufacturing facility
  • Completed various tasks in the field of electrical engineering and design
  • Completed numerous PMS, and Quality Control reviews to meet the requirements of ISO 14001, and other applicable regulations
  • Completed daily, monthly & yearly quality control audits of all processes and equipment
  • Completed over 100 project and analysis reports for the company
  • Completed projects on schedule with no delays, and completed all necessary paperwork
  • Ensured the timely and accurate processing of invoice payments
  • Ensured the quality of all product produced by the team and ensured that it met the quality standards of all other team member
  • Ensured timely and cost effective implementation of the project management system
  • Ensured accurate and on-going documentation of the process
  • Ensured production and customer satisfaction by ensuring all production and quality requirements were achieved
  • Ensured the highest levels of product reliability and safety, including the development of a manufacturing process that reduced the production cost by over 30 percent
  • Ensured compliance with ISO9100 and FDA guidelines for the manufacturing of new products
  • Ensured proper documentation of work orders and reports for each department
  • Ensured high-performance and efficient production of all product components
  • Ensured customer service and safety compliance with company policy
  • Ensured high level of accuracy and quality control for product development
  • Ensured the accuracy of data and reporting for the department
  • Ensured the safety of employees and customers by enforcing the company safety policy and procedure
  • Ensured compliance with regulatory, safety and environmental standards for the production of industrial and consumer products
  • Ensured adherence to all quality and safety requirements, as well
  • Ensured continuous improvement of process and equipment to improve reliability, quality assurance and efficiency
  • Ensured data integrity and reliability of the project data base
  • Ensured regulatory compliance with ISO 9000, OSHMA and FDA standards
  • Trained and supervised a team of 10 engineers and project manager
  • Trained to perform analysis of statistical results and to analyze the data
  • Trained, supervised and evaluated personnel in the completion of all required documentation and training
  • Trained all personnel on the proper operation of equipment and processes
  • Trained all employees on the proper procedures and techniques for their job duties, including the use of a computerized system to record and maintain the data
  • Trained the entire department on LEANS and Lean principles, including the development of a new LEAP process
  • Trained the new hires on all safety and environmental policies
  • Trained and supervised a group of 5 engineers in the development and implementation of a system to track and record the progress of a process to reduce the amount of time required to complete
  • Trained on the latest in manufacturing techniques and technologies to support the development of new and existing products
  • Trained over 200 new and experienced personnel in the safe handling of hazardous waste
  • Trained, coached & developed a lean team of 8 to 10 people in the areas of production planning and cost containment
  • Trained engineers on the design and implementation of various new technologies
  • Trained junior personnel on the process and procedure of corrective measures
  • Trained all new hires on the system and assisted with training of all new hire personnel
  • Trained staff on the process of developing and maintaining a quality assurance system
  • Trained personnel on the safe and effective operation of a hazardous waste management system
  • Trained for the use of a variety tools and processes to ensure the safety of all employees and equipment
  • Trained as a team lead on the use of a variety tools and equipment
  • Trained & mentoring staff on new procedures, process improvements and safety
  • Ensure customer satisfaction by maintaining a high standard of service
  • Planned and implemented a new system for the production of a new product line
  • Planned and implemented a new system for the company to monitor and track employee performance
  • Planned the development of a process to automate the production of a new process
  • Planned & implemented a new corrective actions program for the department
  • Planned a project to develop and test the first PPE for a major oil and gas company
  • Planned engineering changes to improve the reliability of equipment and systems
  • Planned to complete the project in a safe and efficient manor
  • Planned implemented process improvements to meet production schedules and customer requirements
  • Planned out and implemented a process to ensure the safety of all employees and equipment
  • Planned and implemented a process to reduce the time required for a project to be performed by the end of each quarter
  • Planned & Impedenced the implementation of a lean production process
  • Planned processes and implemented improvements to reduce the time required for completion of audit
  • Planned design and implementation of a system to monitor and report on the progress of a project
  • Planned implemented and executed a risk assessment for the project
  • Planned process improvement projects to meet the changing business requirements of a growing organization
  • Planned, coordinated and implemented a new safety training for all personnel in the field
  • Planned and executed the installation of a $2M capital equipment budget
  • Planned work flow and ensured quality control of the project
  • Planned daily work schedules for the entire team, ensuring that work is completed on schedule and within budget
  • Planned out and implemented process improvement projects to meet manufacturing and quality objectives
  • Planned engineering changes to meet the needs of customers, including new equipment and modifications to existing systems
  • Planned process improvements to increase productivity and efficiency of the manufacturing facility, resulting in a reduction of production time by 30%.
  • Planned project schedules and monitored completion dates to meet customer requirements and budget
  • Planned engineering changes to meet the needs of customers, including design and development
  • Monitor work processes and procedures to identify areas of opportunity and recommend improvements to improve efficiency
  • Monitor work performed to assure quality and compliance with standards
  • Designed project scope and schedule to ensure timely delivery of services
  • Designed a system to manage the daily activities of a large-scale data center
  • Designed the data model and developed a regression test framework to evaluate the effectiveness of a new system
  • Designed & implemented a manufacturing and quality system for the company's product lines
  • Designed business process and operational controls for the implementation of a new Risk Assessment System
  • Designed and implemented a process to reduce the production of finished products by 50%, while reducing the production cost by 30%.
  • Designed an automated process to track and monitor the daily activities of a team
  • Designed test equipment and procedures for the development of a new product line
  • Designed implemented a data-driven process for the analysis of data
  • Established a process to reduce the amount of waste and improve quality
  • Established relationships with vendors, engineers and product development teams to ensure timely and accurate completion of product design, development and test
  • Established project management and quality assurance procedures for the development of a new manufacturing facility
  • Established relationships with customers to provide quality customer care and support
  • Established processes and tools to reduce the risk of future failures
  • Established work flow and quality standards for the manufacturing of products
  • Established and managed the Quality Control Department for a major automotive manufacturer
  • Established a process for the development of new processes and equipment
  • Established the company from ground up and grew the organization to over $10 million in annual revenue
  • Established process for the identification and correction of all defects in the production
  • Established processes and systems for the production of high performance parts
  • Established an internal audit team to review and analyze the internal processes
  • Established policies and processes for the development of new and revised processes
  • Established and maintained a strong working relationship with the engineering team to meet production and customer requirements
  • Established an effective and productive team to meet the company's objectives and goals
  • Established process and procedures for the analysis of statistical information
  • Established relationships with suppliers and vendors to meet customer demands
  • Established relationships with customers and vendors to expedited production
  • Established workflows and workflow for the project team to meet production deadlines
  • Reviewed work performed by other engineers to identify and correct any deficiencies
  • Reviewed engineering design and provided technical support to the project teams
  • Reviewed production schedules and quality assurance procedures to determine production sequences and equipment availability
  • Reviewed design and engineering drawings to determine the scope of corrective actions
  • Reviewed project schedules and identified potential issues, risks or delays
  • Reviewed engineering design and provided recommendations for the implementation of a new PPAPS system
  • Reviewed specifications and drawings to ensure compliance with manufacturing and quality standards
  • Reviewed existing and new construction documents to determine the scope of work and to determine the type of equipment needed
  • Reviewed drawings and test plans to ensure compliance with engineering and manufacturing requirements, including the design of new products and processes
  • Reviewed and evaluated the root causes of product defects and provided recommendations for improvements
  • Reviewed all work for errors and compliance with established standards, procedures
  • Reviewed design and engineering changes to meet the customer specifications, and provided recommendations for changes to the existing designs
  • Reviewed, reviewed & evaluated work orders for compliance with established procedures
  • Reviewed project schedules to identify and prioritize tasks
  • Reviewed blue prints to verify the correct part numbers and tolerances
  • Reviewed existing and potential work processes to ensure quality control and compliance with company standards
  • Reviewed job specifications to identify and correct errors in the design of equipment and materials
  • Reviewed over 200 data sources to determine the validity of data
  • Reviewed and approved engineering design changes, modifications to equipment and processes
  • Reviewed engineering drawings and blue prints to ensure compliance with specifications and quality standards
  • Reviewed, analyzed and reported on the performance of quality control and inspection activities
  • Reviewed production schedules and work instructions to ensure product was produced on schedule and within specifications
  • Reviewed, analyzed and reported on the progress of projects
  • Reviewed project plans and provided technical guidance to the team
  • Reviewed designs and provided feedback to the engineering group for improvements and modifications
  • Reviewed product specifications and quality assurance data to identify manufacturing process improvement and cost saving measures
  • Reviewed existing processes and made improvements to enhance the effectiveness of processes and procedures
  • Reviewed daily production and material flow charts to identify production and quality problems
  • Reviewed product specifications and quality assurance reports to ensure that specifications were being met
  • Reviewed existing processes and implemented changes to increase productivity
  • Reviewed data and created new procedures to stream line the process and reduce costs
  • Participated on the design and implementation of a system to monitor the quality of a new product
  • Participated as a team member in the design and implementation of a new system for the company's internal audit
  • Participated in the development of a project to develop an automated test environment for the new product
  • Participated actively in the development of corrective actions for all projects
  • Participated actively in the development of a comprehensive quality program for the company, including a comprehensive quality plan and process
  • Participated & managed the inspection of over 1 million square foot facility
  • Participated extensively in the development of a process control and inspection system for the manufacturing of a new high speed, low cost product
  • Participated directly in the development of a new Statistical Process for the Department of Defense
  • Participated in the implementation of a process to identify and correct root cause of noncompliance
  • Participated as a lead on the design and construction of a new water distribution system
  • Participated and assisted in the implementation of a process for identifying and resolving quality issues
  • Participated in the review of all audit results and recommendations
  • Participated & managed the implementation of a comprehensive root causes and corrective action process for the entire plant
  • Participated directly in the creation of a prototype for an FDA regulated product, which resulted in a significant cost saving
  • Participated the development of a project to improve the process of a new construction project
  • Participated into the development of a comprehensive, multi -million dollar project to improve the quality of a wide array products
  • Participated on the project for a major upgrade of the existing HMI system
  • Participated with the design team to develop a process for the design of an automatic conveyor belt
  • Participated for the implementation of a new system for the AS400, which resulted in a significant reduction of the number and quality issues
  • Participated during the development of a new product
  • Participated to the design and implementation of a system to track and monitor the quality of all work performed by the engineering team
  • Participated into the development of a new FFE (FEMA-FMFR).
  • Participated extensively in the implementation of QMIS for a large scale project
  • Participated extensively in the implementation of a comprehensive safety and environmental management plan
  • Reviewing and summarizing results of studies
  • Reviewed and evaluated work of other employees to identify problems and recommend improvements
  • Review and analyze the results of various projects to identify and evaluate the impact of various changes in project schedule
  • Reviewing and summarization of data for the following projects
  • Review the design and implementation of new equipment
  • Served as the lead for a project to replace the current system with a new, more efficient and cost effective process
  • Served customers with a variety of issues and questions
  • Served the company's first and second generation of new equipment
  • Served to resolve a variety of technical and nonconformance issues
  • Served to improve the quality of production by improving process control, reducing costs and increasing efficiency
  • Served data entry and analysis of the results, prepared statistical reports and presented findings to senior management
  • Served in the role of a Senior Quality Assessor for the entire company
  • Served as a member of the project management and quality control teams
  • Served and maintained the highest quality of service to customers, employees and contractors
  • Served clients with technical support and problem solving for the entire company
  • Served engineering and quality teams in the design of manufacturing and production processes, including the development of manufacturing procedures
  • Served on the Engineering and Manufacturing teams for a wide variety of products
  • Served customers with a high degree of customer satisfaction and resolved all issues
  • Served clients in the manufacturing of high quality, low cost products for the oil and gas industries
  • Supported the design and development of a high performance manufacturing process
  • Supported a variety of manufacturing activities, from the development and implementation of manufacturing processes to the production and quality control of products
  • Supported a variety of production and quality engineering projects, from design to implementation
  • Supported engineering and production teams in the design of manufacturing equipment and processes for the purpose of improving quality and reducing cost
  • Supported and assisted in the design of a process control and quality system for a large scale manufacturing plant
  • Supported project management and engineering activities for the design of a new product
  • Supported management in the development of a comprehensive, action-oriented corrective actions plan
  • Supported new and current projects, developed project schedules
  • Supported engineers in the development of quality assurance programs and processes
  • Supported the design and construction of a $3M new facility
  • Supported development of the new process and manufacturing
  • Supported all phases of the development process from design, prototyping and testing to delivery
  • Supported all phases of the process from initial concept development, to final assembly
  • Supported project teams in the identification of process and equipment improvements
  • Supported development of the project management system for a large, multi-year project
  • Supported project managers in the planning and implementation of new products, processes or procedures
  • Supported project management and quality improvement efforts for the design of a new manufacturing facility
  • Supported in the creation of a custom web based system for the company to track and report on the performance of their products
  • Supported engineering and design team in the creation of a custom software application for the Air Force's (AFAQ-9001 and FRAQ -9010) F
  • Supported in the planning of a major renovation project to the existing building, including all phases of the renovation and installation
  • Supported team in the implementation of a process for identifying and resolving issues related to the process
  • Supported the development of a new statistical process for the department of Health and Safety
  • Supported design and construction of a new facility for the company's largest customer
  • Supported all aspects of the product development process from conception to production, including product development and test
  • Supported development of a comprehensive, cost effective corrective and preventive action program
  • Supported production and engineering team in the design of process control and quality systems
  • Supported production and engineering departments with the design of test equipment and testing procedures
  • Supported manufacturing and production activities by performing duties of a Quality Assessor
  • Supported production and engineering team in the design of a new product
  • Supported management in the implementation of corrective action plan and ensured that all corrective activities are completed in a safe and efficient manner
  • Supported process improvement projects by identifying and resolving issues;
  • Supported engineering and production activities for the design of a new process for the manufacturing of a high-speed polymer
  • Recorded all production and quality control information for the entire production process
  • Recorded work and equipment data for the following projects
  • Recorded production and test data for the Quality Assessment System (SAS).
  • Recorded product data and analyzed it for the development of a new product line
  • Recorded measurements and created drawings for the following projects
  • Recorded data and prepared detailed drawings for the development of industrial automation systems for the automotive industry
  • Recorded and reported on the status of quality issues and corrective action
  • Recorded production data and prepared engineering reports for senior leadership
  • Recorded work orders and coordinated with other disciplines to meet production schedule and quality assurance standards
  • Recorded production data and reported to management on quality
  • Recorded data for the analysis of statistical trends and data collection for the development of statistical models
  • Direct involvement in the planning and execution of quality activities
  • Increased work flow and efficiency by implementing a process for the development of new and revised work instructions
  • Developed and maintained a Quality Management system for the entire plant
  • Develop new procedures for the process of identifying and resolving problems
  • Develop new process and procedures for the analysis of chemical and biological effects on the human body
  • Develop project plan and schedule for the development of a web-based project management tool
  • Developings and implements corrective actions to improve the performance of all departments and processes
  • Develop processes and standards for the development of a quality management system
  • Develop test procedures for the use of data collected from various sources
  • Developed and maintained a database of over 200 suppliers and vendors for the manufacturing of various types and materials
  • Develop and implement a new method for the identification of root causes and corrective measures
  • Develop, implement and monitor the statistical analysis of data
  • Conducts and evaluates the Quality Management Process
  • Conducts and monitors all preventive maintenance actions to prevent the introduction of non-functional equipment into work area
  • Conducts and develops quality control reviews of all products
  • Prepare reports and presentations for management review, including the status of corrective action plans
  • Prepare reports and documents for the management of all manufacturing processes
  • Prepare detailed reports and analyses of the work performance
  • Complete a comprehensive assessment of the project and provide a detailed report of the findings
  • Complete a thorough review of the design and development process to identify the cause of design and development errors